Pasco High School
Selective & Building
Demolition--Summer
2007
TCS Home
Demolition Home
|
We had to demolish this boiler building. It had
a deep basement. |
|
Nakia loading remnants of the boiler building. |
|

We left our "security" door for last. |
|

We had to sawcut the concrete roof overhang in preparation for the
new addition. |
|

Charlie grabs his umpteenth load for a trip to the recycler. |
|

Our Brokk robots travel with us. |
|

We had to strip the ceilings in all of the racquetball courts. |
|

George enjoying summer in Pasco. |
|

Preparing to make a huge opening between two courts, George finishes
a vertical cut. |
|

Then Nakia does the horizontal cut. |
|

The general contractor was impressed with the ingenious way we
demolished the concrete. There was zero collateral damage. |
|
|