McDonald's N. Division, Spokane
Selective Demolition--July 2005
TCS Home
Demolition Home
|
The solarium was to be removed. |
|
Included framed walls & roof structure. |
|

We use our 10 cubic yard roll-off container for concrete & CMU
waste. |
|

Our Freightliner, and Superintendent Landon Brown in fall protection
on the roof. |
|

The HVAC RTU ready to be craned off. |
|

We try to get our equipment as close to the waste stream as
possible. Our skidsteer moves waste floor tile to the smaller
container from here. |
|

Our Brokk 150 quickly broke up the slab and foundation. |
|

Our mini-excavator easily extracted the concrete waste. Our 30
cubic yard container is still receiving "soft" debris.
We protected the asphalt. |
|

All done with the solarium. Our air compressor cooling off on a
hot summer day. |
|

The entire drive-thru structure was to be removed. |
|

Roof tiles removed from drive-thru. Our generator chained to
compressor for some theft protection. |
|

Mission accomplished. Some mansard parapet framing removal
still necessary. |
|

Soffit removal was a tedious manual process. |
|

Uhhh . . . this is not a good thing. |
|

Now for the hard part. The ceramic tile was directly adhered to
the CMU walls. |
|

And the ceiling was double layered with loads of loose insulation to
snow down on us. |
|

Detailing the ceiling and walls. |
|

All done except for floor tile. |
|

No more solarium. |
|

We had to use our hydraulic hand saw to cut the basement slab for
plumbing trenches. |
|

We cut the slab for electrical trenches and the CMU wall for a new
opening. |
|

Floor tile removal was often a team effort. |
|

This was some of the toughest floor tile we've ever worked on.
Nothing seemed to work.
|
|

Our meanest tools just bounced off it. |
|

The boss tests out an extreme method--the ole 60 pound
jackhammer. It didn't work very well.
|
|

Ready for the next job. |