McDonald's, Downtown Spokane
Selective Demolition--Fall 2005
TCS Home
Demolition Home
|
East side roof structure removal. |
|
Dining area before demo. |
|

We just love putting our containers close. Our beautiful
generator is in the background. |
|

East side ready for new tower. |
|

We had to strip the soffits. |
|

The restroom roof structure removal is done. |
|

All done on the west side. |
|

Ready for a small tower above the drive-thru. |
|

Sure . . . let's block 3rd Avenue . . . |
|

The dining mezzanine neatly stripped. |
|

The floor was stoutly built for two ceramic tile layers and 2"
of concrete. |
|

It was manually demolished stick by stick. The steel beam
required "hydraulic" assistance to remove |
|

With a little rigging . . . |
|

. . . the beam came right out . . . |
|

. . . with the help of the general contractor's cherry reach
forklift. |
|

In the tight quarters we positioned our Volvo, . . . |
|

. . . rolled off the flatbed, then loaded the beam and some
really nice salvaged floor joists. |
|

The V.P. moonlights as an expert operator. |
|

Matt carefully separates the stairs from the wall. |
|

But who will load the debris? |
|

The Brokk 150 assumes menacing posture. |
|

CMU ready for sawcutting. |
|

Two fresh openings.
|
|

Still some floor tile to chip off. |
|

Sometimes it's easier to just do things the old-school way.
|
|

Other contractors were jealous of our van trailer. |