Spokane Convention Center
Selective Demolition--October 2005
TCS Home
Demolition Home
|
The staging area for our equipment
behind the Doubletree Hotel. |
|
Our primary access to the interior. |
|

Our Brokk 250 Robot outside the secondary access. |
|

This lift was a monster. Note to self: do not
use the handrails as a demolition tool. |
|

The new promenade approaches our staging area. |
|

Almost ready to sawcut the 8" tilt-up panel. |
|

Coredrilled, sawcut, and ready to push out. |
|

Everyone enjoyed the show. |
|

Couldn't have asked for a better landing. |
|

The forklift worked well for pushing it out. |
|

All finishes were to be removed. |
|

All non-structural steel framing was removed. |
|

The large operable partition on the left had to remain. |
|

The "smaller" operable wall had to go. |
|

That was one big door header. |
|

We managed to avoid breaking the glass wall. |
|

The slab peeled up easily after our Brokk 250 softened it up with a
mushroom bit. |
|

Water misting helped keep the dust down. |
|

Lights? . . . we don't need no stinkin' lights!
|
|
|